The internet home for Hoos anywhere and everywhere.

Virginia Baseball Board

UVA001

Joined: 8/30/13 Posts: 86
Likes: 77


Here's some clarification


The bullpen behind the left field fence is no longer part of the project. The visiting team's bullpen (the visiting team's dugout is now on the third base side of the stadium) will be located down the left field line on the warning track. Similar to where it was in the past down the right field line.

The area that served as UVA's bullpen (the cutout down the left field line) will have new seating starting this year. Those seating sections will be of a temporary nature for the 2018 season. The construction phase for the permanent sections in that area will begin following the conclusion of the season.

(In response to this post by Wahoosyourdaddy)

Posted: 01/11/2018 at 12:37PM



+0

Insert a Link

Enter the title of the link here:


Enter the full web address of the link here -- include the "http://" part:


Current Thread:
 
  
Stadium update -- Wahoosyourdaddy 01/10/2018 7:02PM
  Here's some clarification -- UVA001 01/11/2018 12:37PM
  What are the plans for the left field bleachers? -- HOOfan_1 01/11/2018 08:17AM
  Wasn't this supposed to be 2 phases? -- TJUCavs 01/10/2018 7:43PM

Get the Sabre Edge!

Subscribe to TheSabre.com!

Support Us by Shopping at Amazon

vm311